
Check out this case study about the construction of a three-storey 800 square meter residence raised on helical piles over a sloping terrain. Some obstacles and challenges of the project were: limited building space, building on unstable soils/engineering fill and elevating a structure above ground.









Come visit us at Construct Canada at Booth 1019 from Nov. 30 to December 2, 2011 at the Toronto Convention Centre. 